Subcontract details
Layher Blitz facade scaffolding
Client: UDRA Construtora Lda.
Location: Lisbon, Portugal
Execution Period: 8 months
Description:
Construção de urbanização habitacional composta por quatro lotes. Construction of a residential urbanisation comprising four plots. Approximately 7500m2 were erected with various accessories and types of scaffolding, including cantilevers, suspended scaffolding and interior back scaffolding. These scaffoldings varied in height up to a maximum of 34 metres. In total they represent 150 tonnes of “facade” scaffolding.
Various access stairs, mobile towers and lift boxes were also assembled on the multidirectional scaffolding. Systema Vertical also assembled four ALHER T2-CR freight elevators with a maximum load capacity of 1,300kg. Each unit has a mast height of 34 metres and nine automatic floor stops.