“ALBERJINHO” PROJECT

Subcontract details

Layher Allround multidirectional scaffolding

Client: Htecnic
Location: : Ribeira do Alberginho, Alcácer do Sal
Execution Period:12 months

Desciption:
Contract for the rehabilitation and reinforcement of the viaduct over the Alberginho stream on the a2/a6/a13 / alcácer do sal junction of the A2 – motorway of the south. A total of 200 tonnes of multidirectional were erected at the same time, with several scheduled rotations.